Type of Facility: New Armed Forces Reserve Center
Construction Cost: $15 MM (Aireko as part of The Korte design-build team, self-performed over $4MM in site, concrete and mechanical works)
[ SCOPE OF WORK ]
This 54,800 SF design-build project consists of an Armed Forces Reserve Center and Unheated Storage buildings.
The Training Center is comprised of a two-story conventional building situated around a central courtyard. web search history The Training Center includes open and private offices on both 1st and 2nd floors, classrooms, Assembly Hall, mechanical & electrical rooms, locker rooms, fitness room, weapons simulator and control rooms and an armory/vault. The UHS building is constructed with a site-cast concrete exterior wall system with a painted finish and a standing seam metal roof. The project includes the installation of two 20,000-gallon on-site water storage tanks and a fire pump. The tanks in combination with the fire pump will ensure the AFRC is protected in accordance with UFC and NFPA fire suppression requirements.
This building is registered USGBC LEED Gold.